With the Maini decking drophead system, striking can be carried out after only one day (depending on the slab thickness and strength of the concrete). The drophead is released with a hammer blow, which causes the formwork to drop 60 mm (panels and main beams). The panels can be separated easily from the concrete and immediately used for the next cycle. Furthermore, on-site material requirements are reduced. The Maini main beam reduces the number of props needed; only one prop is required per slab area of 3.45 m² for thicknesses up to 40 cm. This saves time and simplifies the transportation of formwork materials across the site.
Maini decking panels as well as main beams are equipped with self-draining edges. The edges of the panels are undercut, which ensures cleaning is kept to a minimum, resulting in shorter shuttering times.