Ajay Maini Group, introduced the Maini Aluminium Formwork System (MAFS), in the market in late 2008. It proved itself to be able to sustain itself and stand as the only Indian company to provide a complete, end-to-end solution in the field of aluminium formwork. The AJAY MAINI GROUP, has proven to be among the leading manufacturers of construction formwork.

MAFS, offers an aluminium formwork construction system that has been developed and successfully used to form cast-in-place reinforced concrete structures.

It is a system for organising and controlling the work of construction, such as steel reinforcement, concrete placement, mechanical and electrical conduits.

Using our aluminium formwork solutions, all building components can be cast in a single operation, including walls, floor slabs, columns and beams, stairs, window hoods, balconies, and various decorative features in exact accordance with the architects’ design.

The system is fast, simple, and very cost-effective. It is unique because it forms all of the concrete in a building, including the dimensional accuracy of the concrete work, which also results in the consistent fitting of doors and windows. The smooth, off-form finish of the concrete removed the need for costly plastering.

Maini’s aluminium formwork system increases efficiency and also produces an extraordinarily strong structure with an excellent concrete finish.
Aluminium formwork gives consistent concrete shapes and finishes that are obtained floor after floor. This allows all fittings like electrical and plumbing to be pre-fabricated with the certain knowledge that there will be an exact fit when assembled.

Unlike other construction systems, the Formwork System of aluminium forms can be erected by unskilled labour without the need for hoisting cranes. The largest panel weighs no more than 30 kg, which means it can be handled by a single worker.

Doors and window openings are also incorporated. The structure is strong and accurate in its dimensions and results in a high-quality surface finish with only the minimum required for final surface finishing.

MAFS, System Formwork can dramatically increase the speed of construction, with an average 4-5 day floor construction cycle.

Single node action and unique locking make ‘cuplock’ a fast, versatile, and optimised system of scaffolding for construction, demolition, and maintenance projects throughout the world. Highlights of the Cuplock System manufactured by MAINI Group, quick fastening of ledgers: Four ledgers can be fastened at one time with the firm clamping action of the top cup, making the join rigid. Quick erection and dismantling results in time and labour savings. Versatile use in construction, demolition, and maintenance projects for any type of structure, i.e., straight or curved Easy erection with no loose components, low maintenance, and safety with a proven track record.

Applications of MAINI Aluminum Formwork System
RESIDENTIAL
  • High-rise buildings developments and affordable housing projects.
  • Low-rise with multiple block clusters-PMAY Projects.
  • High-rise landed housing and villa developments.
  • Townships
  • Single, double or multi storey housing.
COMMERCIAL
  • High-rise office buildings.
  • High-rise Hotels.
  • Mixed used buildlings (Office/Hotel/Residential)
Benefits of MAINI Aluminum Formwork System
REUSABLE

MAFS formwork can be used several hundreds of times on multiple projects.

LIGHTWEIGHT

Average weight is only 23-25 kg m2 so no heavy lifting or cranes are required.

FINISH QUALITY

Achieves a high-quality finish with no plastering required.

FAST BUILD CYCLES

Typical cycle time of 1 floor every 4-5 days or 1 single storey house a day are achieved with MAFS Formwork solutions.

FULLY RECYCLABLE

Aluminium formwork is 100% recyclable at the end of its usable life.

REDUCE SITE RUBBISH

Constant reuse keeps the construction clean, safe and tidy.

DESIGN FLEXIBILITY

MAFS design team is highly experienced in designing formwork solutions for multiple types of building and applications.

STRENGTH & STABILITY

Able to withstand high concrete pressures.

REDUCE SITE RUBBISH

Reduced costs, shorter schedule.

REDUCED LABOUR COSTS

Formwork can be assembled with non-skilled labour.

CUPLOCK LEDGER (HORIZONTAL)

Made out of 40mm, N.B. ‘M’ or ‘H’ Tubes confirming to I.S. 1161/I.S. 1239 grade – YST 210/240 with forged blades at the ends. Ledgers manufactured by MCE are of the sizes as mentioned below. Basic futures of Cuplock Ledgers are: Minimum projection of blades avoid damages in handling and uniform dimension makes the cup joint rigid.
Sizes Available
2.5m 1.8m
1.5m 1.25m;
1m 0.9m;